R2112-01 Replace Emergency Generator-Troop H Headquarters Building
The project includes replacement of the existing generator, transfer switches, & associated infrastructure at MSHP Troop H Headquarters & Crime Lab.
Issued for Bid
(click to expand/collapse)
Name | Date | Size | ||
00-Full PDF of Plans | 7/26/2022 | 5.1 MB | ||
01-G1.0_Cover Sheet | 7/26/2022 | 489.2 KB | ||
02-S0.1_General Notes and Typical Details | 7/26/2022 | 379.5 KB | ||
03-S1.1_Foundation Plan and Sections | 7/26/2022 | 408.0 KB | ||
04-M1.1_Mech Symbols, Legend and Abbreviations | 7/26/2022 | 705.2 KB | ||
05-M3.1_Basement Mech Demo Plan | 7/26/2022 | 531.5 KB | ||
06-M3.2_First Floor Mech Demo Plan | 7/26/2022 | 363.8 KB | ||
07-E1.1_Electrical Symbols Legend | 7/26/2022 | 775.4 KB | ||
08-E1.2_Electrical Notes, Symbols and Abbrevations | 7/26/2022 | 1.1 MB | ||
09-E2.1_Electrical Site Plan | 7/26/2022 | 377.1 KB | ||
10-E3.1_Basement Electrical Demo Plan | 7/26/2022 | 439.3 KB | ||
11-E3.2_Basement Electrical Plan | 7/26/2022 | 328.3 KB | ||
12-E4.1_Electrical One Line Diagram | 7/26/2022 | 757.1 KB | ||
13-E5.0_Electrical Details | 7/26/2022 | 481.6 KB |