C2006-01 Replace Boilers & Controls-Farmington Correctional Center

The project includes replacing burners and boiler controls on three 41,000 MBH steam boilers, demolishing (2) Existing Steam Boilers, installing a new steam to domestic hot water plant to support the south loop, installing a new steam to heating water plant to support the south loop, installing a new domestic water booster skid to support the plant and campus, installing new preinsulated fiberglass piping from central plant to south loop, and all infrastructure to support scope listed above. Volume 2 (Alternate #1): The Work includes, but is not limited to, the demolition of steam engine generators, replacement of existing pumped condensate and make-up water piping systems, the installation of a new reverse water treatment system, RO water storage tank, RO water feed pumps, and associated structural, plumbing, piping, insulation, power, control, and instrumentation systems.

Status

Bidding Closed

Prebid Date 8/10/23 10:30am
Bid Date 10/12/23 1:30pm

Company & Contacts

The State of Missouri Office of Administration
Christopher Lloyd  
christopher.lloyd@oa.mo.gov

Location

Farmington, MO

Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net.  A hard copy set of documents is available for a refundable deposit of $100, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them.  A download is available for a purchase (non-refundable) of $100 that can be paid via credit card (you will see this option only when logged in).