X2119-01 Resurface & Rehabilitate Paved Trail, Phase 1-Babler Memorial State Park
The work consists of upgrades to existing pedestrian trail. The work includes asphalt pavement repair, asphalt overlay of existing trail, widening of existing trail, storm culvert and headwall replacement. The trail improvements will be from Station 0+00 to Station 41+66 and Station 55+00 to Station 85+45. Project will be bid as a lump-sum project. Phase-1 has an Add- Alternate bid item to adjust the trail's vertical alignment and add low water crossings near Stations 29+35 and 34+00.
Status
Bidding Closed
Prebid Date | 2/22/23 10:00am |
Bid Date | 3/9/23 1:30pm |
Company & Contacts
The State of Missouri Office of Administration
Ryan Abbott
ryan.abbott@oa.mo.gov
Location
Wildwood, MO
Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net. A hard copy set of documents is available for a refundable deposit of $30, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them. A download is available for a purchase (non-refundable) of $30 that can be paid via credit card (you will see this option only when logged in).