M2011-01 Upgrade HVAC Controls-Staples Building-Southeast Missouri Mental Health Center
The project will be contained within the Staples buildings only. The existing pneumatic control system shall be demolished and replaced with a direct digital control (DDC) system. The front-end system of the building automation system (BAS) shall be updated. All existing points and sequences from the existing BAS system shall be upgraded and integrated into the new system. This shall include, but is not limited to, the existing chilled water system, existing air handling units, and existing hot water system.
Status
Bidding Closed
Prebid Date | 3/13/24 10:30am |
Bid Date | 4/16/24 1:30pm |
Company & Contacts
The State of Missouri Office of Administration
Shannon Thompson
Location
Farmington, MO
Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net. A hard copy set of documents is available for a refundable deposit of $100, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them. A download is available for a purchase (non-refundable) of $75 that can be paid via credit card (you will see this option only when logged in).