C1806-01 Wastewater Treatment Facility Improvements

The project consists of providing & installation of a flow control structure, Triplepoint NitrOx equipment, blowers, UV disinfection, flow metering, interconnecting piping, structures, electrical equipment, appurtenances as necessary and as shown on the plans.

Status

Bidding Closed

Prebid Date 7/13/22 10:00am
Bid Date 7/28/22 1:30pm

Company & Contacts

The State of Missouri Office of Administration
Eric Hibdon  
eric.hibdon@oa.mo.gov

Location

Moberly, MO

Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net. A hard copy set of documents is available for a refundable deposit of $100, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them. A download is available for a purchase (non-refundable) of $100 that can be paid via credit card.

All bids should be submitted using Missouri Buys at THIS WEBSITE.